Top Page

Tenney Chamber Dry Runs

  • 12/21/2006 (Dry Run #1, Chamber OFF, Door open)

  • 12/21/2006 (Dry Run #2, Chamber ON, setpoint 20C)

  • 12/21/2006 (Dry Run #3, Chamber Cooling to -60C)

  • 12/22/2006 (Chamber at 0C, started Bench heater and bumped it up gradually to 20.5C)

  • 12/29/2006 (Laboratory Testing)

  • 1/4/2007 Chamber at -50C. 14 hour test. Heated AERI BB in increments of 10 degrees

  • 1/10/2007 NIST Test Run # 1 (S-HIS Aborted)